Skip to content

Energy operations business

From a signed proposal to a team at the door

Winning the work was only the beginning. We built the connection between what the customer accepted and what the installation team needed to deliver.

For this energy business, three everyday questions meant looking in different places: who is following up the proposal, is the installation ready, and what has actually been done? Emails, files and updates from different teams held pieces of the answer. We brought them into one working system, while keeping the tools the business already used.

First, give every proposal a next step

Commercial activity can be recorded by voice or text, without filling in each field by hand. Client history, documents and next actions stay together in the CRM, so preparing the next contact takes less searching.

A sale can stall long before installation. We gave each proposal an owner, a stage and a dated next action. Overdue follow-ups are visible, so the commercial team knows which conversation needs to happen next.

Acceptance creates the installation with the customer, agreed solution, value and notes already attached. Materials and stages live with that record. The handover no longer starts with copying the sale into another file.

For the people preparing the job, that record is the handover: what was agreed, who will deliver it and which steps remain. Notes do not have to be reconstructed from the sales conversation, and materials are attached to the same installation. The commercial and installation teams can follow one piece of work instead of maintaining separate versions of it.

A date in the diary is only useful if the job can go ahead. We made material confirmation a condition for scheduling: until receipt is confirmed, booking stays blocked. It is a small rule aimed at avoiding an expensive wasted trip.

Once the material is ready, a shared calendar checks the team’s specialism and availability. An occupied slot is refused. With team workload visible too, planners can distribute new jobs without promising the same team twice.

This makes the calendar part of preparation, rather than a list of promises to check later. Planners can see the occupation of each team before allocating the next installation. The material check and the availability check happen in the same flow, so the person booking the job has the operational context in front of them.

Let the site update the office

The information passed from the sale now reaches the people carrying out the installation. On site, the team works from the record that holds the agreed solution, materials and stages. What was promised to the customer stays alongside the work being delivered.

After an intervention, they describe what was done and by whom, then mark the completed stages. Those entries update progress and status and stay in the installation’s history. The office and management can follow that record as the job moves forward. A colleague returning to it can see what has been completed, without asking the team to send another separate update.

The management view draws on proposals, planning and field records. Sales and installation progress can be followed from the work itself, rather than from another round of spreadsheets and status requests.

Keep the tools that already work

The system sits alongside the company’s email, calendar, invoicing ERP and files. Proposal imports include a review before saving. Less re-entry does not have to mean replacing everything the team knows.

The important change is how information moves between the commercial team and the people delivering the work. Familiar tools remain part of the day, while the shared system carries proposals, readiness and progress. When proposals arrive in a file, the team can check the imported details before saving them. That review keeps the gain in data entry alongside control over what becomes an operational record.

The value delivered

time saved per month
52 h
  • Less manual recording

    Commercial activity captured by voice or text.

  • Reports ready to consult

    Management follows indicators from recorded activity.

All case studies